We have a large fleet of equipment for transportation of wind farm components. We have moved more than 1100 wind power generators in Australia and overseas, totaling more than 9800 loads at over 300,000 tonnes.

full small

Our wind power projects to March 2015

  1. Starfish Hill, SA. 23 Windmills
  2. Lake Bonney Stage 1, SA. 40 Windmills, self unload nacelles
  3. Lake bonney Canunda, SA. 23 Windmills, unload blades, hubs, nacelles
  4. Wattle Point, SA. 55 Windmills, unload blades
  5. Yambuk, VIC. 20 Windmills
  6. Cathederal Rocks, SA 34 Windmills, self unload necelles
  7. Mount Millar, SA. 35 windmills
  8. Alinta, WA. 54 windmills, unloading of blades
  9. Emu Downes, WA, 48 windmills
  10. Woolnorth 1, TAS. 20 windmills
  11. Woolnorth 2, TAS, 20 windmills
  12. Studland Bay, TAS. 25 windmills, unload blades, hubs, nacelles
  13. Lake Bonney 2, SA. 54 windmills, unload blades, hubs, nacelles
  14. Hallet, SA. 44 windmills
  15. Cape Bridgewater, VIC. 29 windmills
  16. Snowtown, SA. 40 windmills
  17. Capital, NSW. 67 windmills, 47 tower sets
  18. Cape Nelson, VIC. 23 windmills
  19. Hallet 2, SA. 34 windmills
  20. Cullerin, NSW. 15 windmills
  21. Clements Gap, SA. 28 windmills
  22. Lake Bonney 2. 13 windmills, unloading blades
  23. Waubra Stage 2, VIC. 50 windmills, unload blades, hubs, nacelles
  24. Waterloo, SA. 37 windmills, unload blades, hubs, nacelles
  25. Collgar, WA. 111 windmills, unload blades, hubs, nacelles
  26. Gunning, NSW. 31 windmills
  27. TE Uku, NZ. 28 windmills
  28. Mahineranghi NZ, 12 windmills
  29. Denham WA, 1 windmill
  30. Hopetoun WA, 1 windmill
  31. Kalbarri WA, 2 windmills
  32. Denmark WA, 2 windmills
  33. Mussleroe Bay TAS, 56 windmills
  34. Snowtown 2 SA, 90 windmills
  35. Gullen Range NSW, 17 towers only
  36. Boco Rock NSW, 67 windmills
  37. Taralga NSW, 51 windmills

 

 The figure above shows the general layouts for components that have been carried. 

 The typical equipment used in windfarm transport includes but is not limited to: 

    • Towers - Dollys and Jinkers, 12  tower sections loaded at any time. 
    • Nacelles - Platform Trailers, 3 Nacelles loaded at any time. 
    • Blades - Extendable Trailers to 50m+, 6 blades loaded at any time. (9 blade trailers available)
    • Cranes - 1 x 140T WLL All Terrain, 6 x 52T Reachstackers, 4 x 18T Slewing, 2 x 18T Mobile 
    • Jacks for loading and unloading Nacelles - 4 sets SWL 120 Tonnes - 2 sets SWL 200 Tonnes

We can increase or decrease delivery rates to suit conditions.